BUILDING OUR FUTURE...TOGETHER IN FAITH

About Our Capital Campaign

Building Our Future ... Together In Faith

$1 million


Campaign Completion Goal

 $700,000


Completion Campaign Pledges

Capital Campaign Totals:

9/1/15 to 2/29/16

$300,000


Still Needed

$3 million $4 million


Funds on Deposit at Diocese

&

Planned Parish/ School Loan

Our Capital Campaign was initiated as part of a long-range planning process. A Steering Committee was formed under the guidance of Fr. Bill Rowland, the Parish Building Committee and School Board to seek input from the parish community concerning the development of a Master Plan. Given the results of the Needs Assessment in the Spring of 2009 and ongoing refinements based on extensive community input, an integrated Master Plan that unifies the design of all facilities and requirements for future generations was developed. Through the input of many parishioners, the need for a Capital Campaign was determined. An attainable budget was determined with the help of the Financial Feasibility Study conducted in September 2009.


Phase 1 Projects include:


Remodeling the interior of the Church including:

  • The altar area, choir area and bathrooms
  • Adding new stained glass windows, niches for the Stations of the Cross and upgrading the sound system
  • New adult immersion Baptismal Font, Paschal Candle Niche and Ambry cabinet
  • New flooring, lightning, skylights, acoustical wall panels and ceiling wood treatment, saint statue niches
  • Refurbished pews and new kneelers, a handicap ramp to the altar, complete painting to the interior and exterior

New 17,000 square foot Education Center used for School and Parish activities and ministries including:

  • 12 new classrooms, 2 sets of student restrooms, staff restrooms and Specialty Rooms
  • New Computer Lab, Library/Media Center, and Reading Resource Rooms
  • New Science Lab integrated into the seventh grade classroom
  • Outside gathering and learning spaces
  • Renovate the existing school to include: Administration offices, new interior finishes for all classrooms, a new roof, and Music Room

New Administration Building Addition:

  • Administration Offices
  • Health Room
  • Business Office
  • Teacher Work Room, break room and restrooms
  • Conference Room

New Chapel of Our Lady:

  • Beautiful new chapel and outdoor patio area
  • Original stained glass windows
  • Seating for 40

New Entry/Exit to Pio Pico:

  • Improved drop-off/pick-up
  • Improved traffic flow
  • 2-way traffic in and out
  • Double-loaded parking
  • 56 parking spaces closer to the church
  • 33 total new parking spaces added to the property

Acquisition of Property to create parking:

  • 5 year Shared Land Use Agreement with adjacent church on Pio Pico - completed October 2015; Gives us necessary sports field and playground space, as well as overflow church parking
Share by: